海外施工现场日常英语(工艺管道)
编辑:ruan18650468816 成考报名 发布时间:10-15 阅读:
海外施工现场日常英语
工艺管道(一)
PROCESS PIPING
1. The design of the process piping is performed directly on a model of the project.
工艺配管的设计是直接按照工程项目的一个模型完成的。
2. The model is an actual working tool for piping.
模型是配管用的实际工具。
3. Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安装工作包括:预制加工、安置、对准、焊接和连接。
4. Our piping prefabrication workshop covers a total area of 1000m2.
我们的管道预制加工厂拥有一千平方米的面积。
5. We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding.
我们可以对管子进行下列预制加工:切割和机械加工坡口,手工和自动焊接等。
6. The computer generates isometric drawings and prints out bill of materials.
计算机绘出管道空视图,并打印出材料明细表。
7. We shall complete the manhour requirements for the site fabrication (site erection ) of this drawing.
我们将制订这张图纸现场制作(现场安装)所需的工时条件。
8. Seamless steel tube is made in sizes for 1/8 to 24 inches.
无缝钢管制作的尺寸从八分之一寸到二十四寸。
9. Spiral-welded steel pipe is available in sizes from 6 to 36 inches.
螺旋焊接钢管的尺寸从六寸到三十六寸。
10. Two types of end are standard on steel pipes and fittings, that is flanged and screwed.
钢管和管件有两种标准端部型式,即:法兰和丝扣。